Building & Renovation

Concrete Mixer Hire

Hire a concrete mixer when the job is too large for hand mixing but too small or awkward for ready-mix delivery.

Hiring concrete mixer can make sense when you need the capability for a short project without taking on the purchase, storage and maintenance commitment. The best choice starts with the job—not the headline day rate.

Typical hire1–3 days
Best approachSize the job first
RememberAccessories can matter

What concrete mixer is useful for

Hire a concrete mixer when the job is too large for hand mixing but too small or awkward for ready-mix delivery.

  • Post footings
  • Small slabs
  • Garden edging
  • Repair work

How to choose the right one

Before comparing suppliers, note the job conditions and the capacity that matters. Pay particular attention to:

1Drum capacity
2Electric versus petrol
3Batch size
4Site access
Everyday Hire tip

Work backwards from total concrete volume and realistic batch size so the mixer is not the bottleneck.

What affects the hire cost?

Advertised day rates are only part of the total. Ask for a quote that includes the full period and the extras you actually need.

  • Mixer size
  • Fuel or power
  • Delivery
  • Cleaning fee

Before you book

Measure access

Confirm access, dimensions, job quantity and the maximum capacity you need.

Check accessories

Ask what is included and which bits, blades, hoses, straps, leads or consumables are extra.

Plan transport

Confirm weight, loading and whether you can collect safely or should arrange delivery.

Know the return terms

Check fuel, cleaning, damage and return-time conditions before the hire starts.

Hire or buy?

Hiring is often strongest for occasional, specialised, bulky or maintenance-heavy equipment. Buying becomes more attractive when you use the item frequently, can store it easily and the purchase price is low relative to repeat hire.

Compare hire vs buy

Questions to ask a hire supplier

  • Is this the right capacity for my actual job?
  • What accessories and consumables are included?
  • What deposit, bond, waiver or excess applies?
  • What condition must it be returned in?
  • Can it be delivered, and what access does delivery require?
  • What happens if the job runs longer than planned?

Related building & renovation guides