Power & Climate

Generator Hire

Size temporary generator hire around running load, starting load, output type and the way equipment will be connected.

Hiring generator can make sense when you need the capability for a short project without taking on the purchase, storage and maintenance commitment. The best choice starts with the job—not the headline day rate.

Typical hire1 day to several weeks
Best approachSize the job first
RememberAccessories can matter

What generator is useful for

Size temporary generator hire around running load, starting load, output type and the way equipment will be connected.

  • Power outages
  • Events
  • Construction tools
  • Remote work

How to choose the right one

Before comparing suppliers, note the job conditions and the capacity that matters. Pay particular attention to:

1Running watts and motor starting demand
2Single or three phase
3Noise limits
4Fuel runtime
Everyday Hire tip

For anything beyond simple plug-in loads, have a qualified electrician or supplier design the temporary power setup.

What affects the hire cost?

Advertised day rates are only part of the total. Ask for a quote that includes the full period and the extras you actually need.

  • Generator capacity
  • Fuel
  • Distribution boards and leads
  • Delivery

Before you book

Measure access

Confirm access, dimensions, job quantity and the maximum capacity you need.

Check accessories

Ask what is included and which bits, blades, hoses, straps, leads or consumables are extra.

Plan transport

Confirm weight, loading and whether you can collect safely or should arrange delivery.

Know the return terms

Check fuel, cleaning, damage and return-time conditions before the hire starts.

Hire or buy?

Hiring is often strongest for occasional, specialised, bulky or maintenance-heavy equipment. Buying becomes more attractive when you use the item frequently, can store it easily and the purchase price is low relative to repeat hire.

Compare hire vs buy

Questions to ask a hire supplier

  • Is this the right capacity for my actual job?
  • What accessories and consumables are included?
  • What deposit, bond, waiver or excess applies?
  • What condition must it be returned in?
  • Can it be delivered, and what access does delivery require?
  • What happens if the job runs longer than planned?